Our process
A turnkey process built around how hotels actually run — including the guests still checked in while we work.
Five steps, one team
Timings are typical for a 150–250 key hotel. Smaller projects move faster; we’ll give you a schedule after the survey.
Consultation & site surveyWeek 1
We visit the property, take laser measurements and review your architectural drawings.
- Measurements for every window type
- Swatch presentation for design and procurement teams
- Budget and specification options
Mock-up roomWeeks 2–4
We make and install a complete sample guestroom before anything is ordered in bulk.
- Management inspection and sign-off
- Light-leak testing at night
- Housekeeping tries take-down and re-hanging
Precision fabricationWeeks 4–8
Fabrics are woven or pulled from stock, then cut, pleated and finished at our facility.
- Custom pleating and weighted hems
- Every panel labelled by room and window
- Quality checks on stitching and size
Phased installationWeeks 8–12
Our own crews install floor by floor, scheduled around your occupancy.
- No disruption to guests in occupied floors
- Motor programming and GRMS testing
- Final steam-press and handover
Aftercare & AMCOngoing
We stay on after handover with warranties, spares and annual maintenance.
- Warranty on tracks and motors
- Fast spare parts
- Annual motor calibration and track servicing
Start with a site survey.
We’ll measure, show you swatches and give you a clear proposal with timings.
Request a quoteCall +91 79733 49141